LogoLogo
Discord
  • Documentation
  • Projects
  • Changelog
  • Build Instructions
  • Mercury One.1
    • Introduction
    • Bill of material
    • Files
    • Build Instruction
      • Mercury One.1
      • Phase 1
        • Printing
        • Concepts
  • Hydra
    • Introduction
    • Bill of Material
    • Files
    • Build Instruction
      • Phase 1
        • 1. Assembling left arm
  • Nebula
    • Introduction
    • Bill of Material
    • Files
    • Build Instruction
      • Phase 1
        • Gather and Identify Components
      • Phase 2
        • Building the vertical frame
        • Building the side frame
  • External Links
    • Discord
    • Github
Powered by GitBook

Copyright © 2024, ZeroG. All rights reserved. ZeroG by https://zerog.one/ is licensed under a CC BY-NC-SA 4.0 International License.

On this page

Was this helpful?

Edit on GitHub
Export as PDF
  1. Nebula
  2. Build Instruction
  3. Phase 2

Building the side frame

PreviousBuilding the vertical frame

Last updated 2 months ago

Was this helpful?

Now we will build the right side of the frame.

QTY.
Nebula 255
Nebula 370

A

4x

2020 650mm

2020 800mm

B

2x

2020 450mm

2020 600mm

C

2x

2040 450mm

2040 600mm

D

2x

2020 410mm

2020 560mm

E

2x

2020 410mm

2020 538mm

F

4x

2040 400mm

2040 510mm

G

1x

2020 400mm

2020 510mm

H

2x

2020 370mm

2020 498mm

I

3x

2020 370mm

2020 498mm

Above is an overview of the entire assembly.
Insert two M5x10 BHCS into the bottom of each upright assembled previously. Then, slide each upright over Extrusion B.