LogoLogo
Discord
  • Documentation
  • Projects
  • Changelog
  • Build Instructions
  • Mercury One.1
    • Introduction
    • Bill of material
    • Files
    • Build Instruction
      • Mercury One.1
      • Phase 1
        • Printing
        • Concepts
  • Hydra
    • Introduction
    • Bill of Material
    • Files
    • Build Instruction
      • Phase 1
        • 1. Assembling left arm
  • Nebula
    • Introduction
    • Bill of Material
    • Files
    • Build Instruction
      • Phase 1
        • Gather and Identify Components
      • Phase 2
        • Building the vertical frame
        • Building the side frame
  • External Links
    • Discord
    • Github
Powered by GitBook

Copyright © 2024, ZeroG. All rights reserved. ZeroG by https://zerog.one/ is licensed under a CC BY-NC-SA 4.0 International License.

On this page

Was this helpful?

Edit on GitHub
Export as PDF
  1. Hydra

Build Instruction

PreviousFilesNextPhase 1

Last updated 5 months ago

Was this helpful?

Phase
Link
About
Phase
Link
About
Phase
Link
About
Phase
Link
About

1

Get Started ->

Mostly information, introduction, BoM and other important information

2

Get Started ->

Assembly of Hydra Arms

3

Get Started ->

Assembly of Rails on Frame

4

Get Started ->

Installation of motor mounts